Railway Tunnel

KCRC – Tai Lam Tunnel

Completed Project

Alternative design proposal enhances cost efficiency

Dragages proposed an alternative design by combining the two tunnels into a single tube with a partition wall separating the twin rail tracks.

To minimise interference between the excavation and concreting works, a powerful conveyor system was set up, with a capacity of removing 800 tonnes of waste per hour. The method proved to be faster and cleaner than using trucks.

Total excavation took over one and a half years, with some 700,000 cubic metres of waste being transported off site to be used as fill material in another project.

This alternative proposed design allowed the construction programme to be shortened by six months and delivered substantial cost-savings.

Client Kowloon-Canton Railway Corporation
Joint-venture project Design and build a tunnel with a ventilation building
Total tunnel length 5,480m
Tunnel length (handled by Dragages) 2,950m
Construction period 1998 - 2003

Reminder: Fake purchase orders are circulating under the names of Bouygues Construction and the group’s subsidiaries. Protect yourself by carrying out the following checks as a matter of habit:

  • Look for the QR code that is present on every Bouygues Construction purchase order.
  • Check that your contact email address ends with  @bouygues-construction.com or @dragageshk.com
  • If in doubt, or if you receive a fake email, be sure to get in touch with your usual Bouygues contact or use the contact form available on this website.