Bridge

Liu To Bridge

Completed Project

Launching across a steep valley

As environmental issues moved up the agenda in Hong Kong, Dragages was a pioneer in incorporating these considerations into their projects. For the construction of the Liu To Bridge, across an unspoiled ravine on Tsing Yi Island, Dragages developed a technique which would avoid the need for scaffolding in the valley below.

The process, introduced by Dragages, involved launching incrementally four separate sections of the deck from both ends of the bridge. Once the four sections were in place across the valley, engineers were able to stitch them together in the midpoints to create the final structure.

Client Highways Department, Hong Kong Government
Project Construction of a 4-lane bridge
Central span 70m
Construction period 1986 - 1987

Reminder: Fake purchase orders are circulating under the names of Bouygues Construction and the group’s subsidiaries. Protect yourself by carrying out the following checks as a matter of habit:

  • Look for the QR code that is present on every Bouygues Construction purchase order.
  • Check that your contact email address ends with  @bouygues-construction.com or @dragageshk.com
  • If in doubt, or if you receive a fake email, be sure to get in touch with your usual Bouygues contact or use the contact form available on this website.