Tunnel

Inter-reservoirs Transfer Scheme – Water Tunnel between Kowloon Byewash Reservoir and Lower Shing Mun Reservoir

Current Project

Bouygues Travaux Publics will construct a tunnel of approximately 2.8km long with a 3-metre diameter from the Kowloon Byewash Reservoir to the Lower Shing Mun Reservoir, and the associated intake and outfall structures at both ends of the tunnel. When completed in 2022, the tunnel will serve dual objectives of improving flood protection level in West Kowloon areas and optimising water conservation, by transferring collected surface runoff from the Kowloon group of reservoirs to the Lower Shing Mun Reservoir. In the long run, this tunnel will strengthen the city’s resilience in flood mitigation to combat climate change.

The worksite locates at the tranquil Kam Shan Country Park. Meticulous project planning will be executing to ensure a smooth flow of all construction activities, also to conserve the precious natural environment.

Client Drainage Services Department, Hong Kong SAR Government
Project Construction of a 2.8km-long water tunnel with a 3-metre diameter
Construction period 2019 – present

Reminder: Fake purchase orders are circulating under the names of Bouygues Construction and the group’s subsidiaries. Protect yourself by carrying out the following checks as a matter of habit:

  • Look for the QR code that is present on every Bouygues Construction purchase order.
  • Check that your contact email address ends with  @bouygues-construction.com or @dragageshk.com
  • If in doubt, or if you receive a fake email, be sure to get in touch with your usual Bouygues contact or use the contact form available on this website.