East Tsing Yi Viaduct

Completed Project

The East Tsing Yi Viaduct is an essential connection between Nam Wan Tunnel and Stonecutters Bridge. It is an integral part of the road network development to divert busy traffic between the airport and the city centre.
 
The joint-venture was mainly responsible for constructing a three-lane dual carriageway, as well as associated works including viaduct ramps, roadworks, drainage, slope works, landscaping and environmental mitigation measures.
 
Pre-cast box girder segments were predominantly used for the viaduct and were erected using the balanced cantilever method to ensure maximum time efficiency and minimal environmental impact.
 
In total, 18 pre-cast segmental bridge sections were made from almost 2,000 pre-cast segments and 51 in-situ segments. Advantages of this method included a cleaner site and a faster construction time in this environmentally-sensitive area.

Client Highways Department, Hong Kong Government
Joint-venture project Construction of a dual three-lane carriageway
Construction period 2004 - 2008

Reminder: Fake purchase orders are circulating under the names of Bouygues Construction and the group’s subsidiaries. Protect yourself by carrying out the following checks as a matter of habit:

  • Look for the QR code that is present on every Bouygues Construction purchase order.
  • Check that your contact email address ends with  @bouygues-construction.com or @dragageshk.com
  • If in doubt, or if you receive a fake email, be sure to get in touch with your usual Bouygues contact or use the contact form available on this website.