Railway

Admiralty and Central MTR Stations

Completed Project

Located beneath two of the busiest streets on Hong Kong Island and alongside the foundations of some of the city’s most prestigious buildings, precision was essential in the design and construction of both stations.

The Central site adopted a top-down method allowing excavation to take place below ground, while building works began above. The site also required special excavation techniques to avoid damage to adjacent buildings.

More than 30 years on, the stations remain essential arteries in Hong Kong’s busy MTR, transporting generations of commuters from their homes to their work places.

Client MTR Corporation
Joint-venture project Design and build the Stations
Construction period 1976 - 1982

Reminder: Fake purchase orders are circulating under the names of Bouygues Construction and the group’s subsidiaries. Protect yourself by carrying out the following checks as a matter of habit:

  • Look for the QR code that is present on every Bouygues Construction purchase order.
  • Check that your contact email address ends with  @bouygues-construction.com or @dragageshk.com
  • If in doubt, or if you receive a fake email, be sure to get in touch with your usual Bouygues contact or use the contact form available on this website.