Page 73 - Dragages Hong Kong 60th Anniversary
P. 73

8 mins
By connecting Western districts with the city’s business hub, travelling time between Kennedy Town and Sheung Wan will be reduced from about 20 minutes to just 8 minutes. 港鐵西港島綫連繫港島西區及市區商業及金融中心,由堅尼地城至上環站所需車程由約二十分鐘縮短至八分鐘。
Client
客戶
Joint-venture Project
聯營項目
Eastbound Running Tunnel
東行綫隧道
Westbound Running Tunnel
西行綫隧道 Completion 完工
MTR Corporation
港鐵公司
Construction of two tunnels, two passenger entrances, demolition of an overrun tunnel and the associated works 建造兩條隧道、兩個車站出入口、拆卸現有的掉車隧道段 及相關工程
770m long (from Sai Ying Pun to Sheung Wan crossover box) 770米長(從西營盤伸延至上環交匯點)
490m long (from Sai Ying Pun to Sheung Wan overrun tunnel) 490米長(從西營盤伸延至上環掉車隧道段)
2014